Bathroom Plumbing inCheltenham & Gloucestershire
Pipework that's planned properly behind the scenes, so taps, toilets and showers work as they should and you're not dealing with drips and leaks later.
5-star rated on Google · 12 years' experience

- 12 years' experience
- 5.0 rating on Google
- Free 3D design
- Free quotes & site visits
- Public liability insured
Plumbing
The Work You Don't See, Done Right
Behind every good bathroom is good plumbing. Moving a toilet, fitting concealed valves or adding a wall-mounted tap all depend on pipework that's planned, fitted and tested properly.
Ryan carries out general plumbing work, backed by a City & Guilds heating engineering qualification. He handles the plumbing for his own bathroom installations and smaller plumbing jobs around the bathroom.
Please note that Ryan does not carry out gas or boiler work.
Recent Plumbing Projects







Why it matters
Why Small Plumbing Problems Grow
Slow leaks cause big damage
A drip under a basin or behind a panel can soak floors and ceilings for months before it's noticed.
Poor pressure and flow
Badly planned pipework can leave showers weak and taps slow.
Running costs
A constantly running toilet or dripping tap wastes water every day.
Common mistakes to avoid
- Ignoring small drips and damp patches
- Fitting new taps on old, worn connections
- Moving fixtures without considering waste falls
- Hiding pipework without easy access for later
Our process
How Your Plumbing Works
STEP 1
Free Site Visit & Quote
Ryan visits, measures up, checks pipework and surfaces, and listens to what you want. You get a clear quote with no obligation.
STEP 2
Free 3D Design
See your new room before work starts. Change the layout or finishes on screen until it's right.
STEP 3
Strip-Out & Preparation
The old room is removed and the waste taken away. Walls, floors and pipework are prepared properly.
STEP 4
Installation
Ryan fits everything himself: plumbing, suite, tiling and finishing, with care and tidiness throughout.
STEP 5
Checks & Clean-Up
Connections are checked, waste is taken away and the room is cleaned before handover.
The benefits
What You Get With Camms Bathrooms
Qualified
Backed by a City & Guilds heating engineering qualification.
Planned with the design
Pipework is planned around the 3D design so everything lands in the right place.
Tested before finishing
Connections are checked before walls and floors are closed up.
One trade for the room
Plumbing, fitting and tiling by one person keeps the job joined up.
In detail
Plumbing Work Covered
Repositioning fixtures
Moving toilets, basins, baths and showers to suit a new layout, including waste pipe changes.
Concealed valves and taps
Built-in shower valves and wall-mounted taps for a cleaner, modern finish.
Replacing fittings
Swapping taps, toilets, basins and wastes.
Not covered
Gas, boiler and central heating installation work is not offered.
No. Ryan does not carry out gas, boiler or central heating installation work.
Free, no-obligation quote
See Your New RoomBefore Work Starts
Book a free site visit. Ryan will measure up, talk it through and show you a free 3D design before you commit to anything.
- Free quote and site visit
- Free 3D design
- Strip-out and waste removal included
- 5-star rated on Google
